Index of
Education Building Construction Progress
(from October, 2008, to present)
(Click on picture to view enlarged copy)
| The new Education Building required the demolition of the old Wesley House and the adjacent apartments facing Olive Ave.. |
|
|
Demolition of existing structures started as soon as approval was obtained. |
|
| It didn't take long for the bulldozers to knockdown the Wesley House and the apartments. |
|
All rubble gone and ready to start digging out the basement.
|
|
|
Digging out for the basement seemed to take a long time.
|
|
|
But it was finally done and the floor could be levelled.
|
|
Next, a hole for the elevator had to be dug.
|
|
|
Now the basement walls could be started.
|
|
|
.And soon the basement walls were finished.
|
|
The basement floor is laid.
|
|
|
.Framing-in the basement rooms
|
|
|
Next they laid down the
|
|
Framing in the
|
|
|
|
From the Sun Deck you can almost hear the choir singing
|
|
2nd Floor going up!
|
|